From 8fa85725f454d8e727763460dcfa63aaa16b18b2 Mon Sep 17 00:00:00 2001
From: Kevin Wolf <kwolf@redhat.com>
Date: Tue, 26 Jun 2018 09:48:53 +0200
Subject: [PATCH 84/89] jobs: fix stale wording
RH-Author: Kevin Wolf <kwolf@redhat.com>
Message-id: <20180626094856.6924-71-kwolf@redhat.com>
Patchwork-id: 81107
O-Subject: [RHV-7.6 qemu-kvm-rhev PATCH v2 70/73] jobs: fix stale wording
Bugzilla: 1513543
RH-Acked-by: Jeffrey Cody <jcody@redhat.com>
RH-Acked-by: Max Reitz <mreitz@redhat.com>
RH-Acked-by: Fam Zheng <famz@redhat.com>
From: John Snow <jsnow@redhat.com>
During the design for manual completion, we decided not to use the
"manual" property as a shorthand for both auto-dismiss and auto-finalize.
Fix the wording.
Signed-off-by: John Snow <jsnow@redhat.com>
Reviewed-by: Jeff Cody <jcody@redhat.com>
Reviewed-by: Markus Armbruster <armbru@redhat.com>
Signed-off-by: Kevin Wolf <kwolf@redhat.com>
(cherry picked from commit c5b09f3f2c4db32f39ecbde2cf2f78e7a657a85d)
Signed-off-by: Kevin Wolf <kwolf@redhat.com>
Signed-off-by: Miroslav Rezanina <mrezanin@redhat.com>
---
qapi/job.json | 11 ++++++-----
1 file changed, 6 insertions(+), 5 deletions(-)
diff --git a/qapi/job.json b/qapi/job.json
index 17d1003..2264435 100644
--- a/qapi/job.json
+++ b/qapi/job.json
@@ -50,16 +50,17 @@
# the last job in a transaction.
#
# @pending: The job has finished its work, but has finalization steps that it
-# needs to make prior to completing. These changes may require
-# manual intervention by the management process if manual was set
-# to true. These changes may still fail.
+# needs to make prior to completing. These changes will require
+# manual intervention via @job-finalize if auto-finalize was set to
+# false. These pending changes may still fail.
#
# @aborting: The job is in the process of being aborted, and will finish with
# an error. The job will afterwards report that it is @concluded.
# This status may not be visible to the management process.
#
-# @concluded: The job has finished all work. If manual was set to true, the job
-# will remain in the query list until it is dismissed.
+# @concluded: The job has finished all work. If auto-dismiss was set to false,
+# the job will remain in the query list until it is dismissed via
+# @job-dismiss.
#
# @null: The job is in the process of being dismantled. This state should not
# ever be visible externally.
--
1.8.3.1