Repository Work Lines
The content production inside &TCAR; has been divided into
individual work lines that relate one another based on the
idea of doing one thing well. In this model, the content
produced individually by each work line is combined one
another later to achieve higher purposes (e.g., corporate
identity for &TCP;). The repository work lines, as conceived
here, provide a relaible environment for people to work
syncronized and descentralized.
The action of combining work lines one another inside &TCAR;
is known as the corporate identity production cycle. The rest
of this section describes the work lines available in the
repository and their position inside the corporate identity
production cycle.
Visual Identity
The visual identity is the first component we work out in
order to produce a new corporate identity. Through this work
line, graphic designers create models
and
motifs
for all the visual manifestation &TCP;
is made of. Once design models and artistic motifs are set in
place, graphic designers use the render
functionality described in to combine both design models and artistic motifs into
final images.
The main purposes of this work line is define all the visual
manifestations the &TCP; is made of and provide design models
and artistic motifs for them in order to render the set of
images required to transmit the visual style that identifies
&TCP; as unique organization. To know more about &TCPCVI;,
read .
The visual identity work line takes palce in the trunk/Identity directory.
Localization
The content localization is the second component that must be
worked out in the corporate identity production cycle.
Through this work line translators localize source files
(e.g., SVG, DocBook, Shell scripts) which are later use to
produce localized images, localized documentation and
localized automation scripts. To localize source files,
translators use
the locale functionality described in
which takes care of
retriving translatable strings from source files and provide a
consistent localization interface based on GNU
gettext multi-lingual message
production tool set and xml2po command.
The main purpose of this work line is extend the visual
identity (produced in English language) to as many native
languages as possible in order for people which doesn't
understand English languague to feel more confortable with
&TCP; and its messages. To know more about the specific
localization process read .
The localization work line takes palce in the trunk/Locales directory.
Documentation
The documentation work line is the third component that must
be worked out in the corporate identity production cycle.
Through this work line documentors settle down the conceptual
and practical used to edificate &TCAR;. To write
documentation, documentors use the help
functionality described in which provides a consistent interface for building
documentation through different documentation backends (e.g.,
Texinfo, DocBook, LaTeX, etc.).
The main purpose of this work line is describe the standard
procedures &TCAR; realies on, as well as conceive a place to
help you understand what &TCAR; is and what can you do with
it.
The documentation work line takes palce in the trunk/Manuals directory.
Packaging
...
Automation
The automation work line is the fifth and last component that
must be worked out in the corporate identity production cycle.
This work line closes the production cycle and provides the
production standards graphic designers, documentors,
translators and packagers need to make their work consistent
and reusable. For this purpose, programmers develop the
centos-art.sh script described in .
The main purpose of this work line is standardize the
interaction of work lines in a reliable way.
The automation work line takes palce in the trunk/Scripts directory.